Construction loan approved for 345‑unit Hoboken Urby at 256 Observer Highway

Article Sponsored by:

CMiC Global

CMIC Global Logo

Since 1974, CMiC has been a global leader in enterprise software for the construction industry. Headquartered in Toronto, Canada, CMiC delivers a fully integrated platform that streamlines project management, financials, and field operations.

With a focus on innovation and customer success, CMiC empowers construction firms to enhance efficiency, improve collaboration, and make data-driven decisions. Trusted by industry leaders worldwide, CMiC continues to shape the future of construction technology.

Read More About CMiC: 

Construction of Hoboken Urby mixed-use building at 256 Observer Highway with cranes and street-level retail

256 Observer Highway, Hoboken, NJ, September 6, 2025

News Summary

A $162 million senior construction loan has been approved to finance Hoboken Urby, a 16‑story, 418,332‑square‑foot Class A mixed‑use building at 256 Observer Highway. The project will deliver 345 apartments — 307 market‑rate and 38 affordable — with roughly 17,000–17,425 sq ft of street‑level retail, a 152‑space parking garage and a full suite of amenities including a café, speakeasy, fitness center, landscaped deck and rooftop dog run. BlueGate Partners led the capital execution for the developer affiliate, and vertical construction is already underway with completion expected within a few years.

Major construction loan closes for Hoboken Urby — 345 units, 16 stories

A $162 million senior construction loan has been approved by PCCP to fund the ground-up development of Hoboken Urby, a 16-story, 418,332-square-foot mixed-use building at 256 Observer Highway on the southern edge of Hoboken, N.J. The loan was made to an affiliate of Ironstate Holdings, with the financing arranged and executed by BlueGate Partners on behalf of Urby and Ironstate.

What the project will deliver

The development will produce 345 residential units across a roughly 1.1-acre site at the corner of Observer Highway and Park Avenue. The unit mix includes 307 market-rate apartments and 38 affordable units. By size, the mix breaks down into approximately 29 studios (8%), 220 one-bedroom units (64%), 61 two-bedroom units (18%) and 35 three-bedroom units (10%).

The building will contain roughly 17,000–17,425 square feet of street-level retail, including a café, and a reported 152-space parking garage. On-site amenities will include a 24/7 concierge, a landscaped amenity deck with BBQ grills, a fitness center, a rooftop dog run, a speakeasy and other shared spaces. Apartment interiors are planned with stainless steel appliances, wood or engineered flooring, custom shelving, Terrazzo tile in bathrooms, walk-in showers and electronic latch access control.

Transit and location advantages

The site sits less than a quarter mile from the Hoboken PATH station and just a few blocks from Hoboken Terminal, providing quick connections to Manhattan by PATH and commuter rail and ferry services. Typical PATH travel times from nearby Hoboken are about 11 minutes to the World Trade Center and about 16 minutes to 33rd Street. The project will also be walkable to Hoboken’s primary retail street, Washington Street.

Financing and team

PCCP provided the senior construction loan. BlueGate Partners handled the financing execution on behalf of Urby and Ironstate. Members of the BlueGate execution team named in the financing are Mark DeLillo, Marc Schulder, Lee Spiegelman, Felipe Marin, Eli Zaoutis and Jeremy Silber.

PCCP’s vice president for the transaction characterized the loan as an opportunity to finance a sizeable, Class A, transit-oriented multifamily property in Hoboken with a borrower who has a strong local track record, and noted the strength of Hoboken’s rental market and the contribution the project is expected to make to placemaking in southern Hoboken. The BlueGate team described the development as a project that will combine thoughtful design, high-quality finishes and modern amenities with strong connectivity to Manhattan.

Timing and construction status

Reports indicate construction will begin immediately and that the project has already “gone vertical” in the early phases. The development is expected to reach completion in early 2028, barring schedule changes.

Local development context

The project arrives amid a local development environment described as having a bottlenecked pipeline: Hoboken has seen population gains over the past two decades but faces limited buildable land and lengthy approval and construction processes. Nearby activity includes a large, high-rise multi-hundred-unit project in a neighboring city that recently topped out and is slated to begin move-ins next year, underscoring regional demand for new housing even as supply remains constrained.

Reporting notes

Multiple industry sources provided consistent details on the loan amount, project size, unit mix, amenities and timelines. The financing is described in filings and project notices as a senior construction loan for a 345-unit, Class A, transit-oriented multifamily development at 256 Observer Highway.

FAQ

What is the loan amount and who provided it?

The project is financed with a $162 million senior construction loan provided by PCCP.

Who is the borrower or owner?

The loan was made to an affiliate of Ironstate Holdings; the development is being delivered in partnership with Urby.

How many units and what is the unit mix?

The building will have 345 units total: 307 market-rate and 38 affordable. The breakdown is about 29 studios, 220 one-bedrooms, 61 two-bedrooms and 35 three-bedrooms.

What are the building size and height?

The project is a 16-story building totaling approximately 418,332 square feet on a roughly 1.1-acre site.

What retail and parking are included?

There will be roughly 17,000–17,425 square feet of retail space, including a café, and a reported 152-space parking garage.

What amenities and unit finishes are planned?

Amenities include a concierge, landscaped amenity deck with grills, fitness center, rooftop dog run, speakeasy and more. Unit finishes are expected to include stainless steel appliances, wood or engineered floors, custom shelving, Terrazzo tile bathrooms, walk-in showers and electronic access control.

How close is the site to transit?

The site is under a quarter mile from the Hoboken PATH station and a few blocks from Hoboken Terminal, with PATH times to Manhattan locations typically in the range of 11–16 minutes.

When will construction be finished?

Construction has begun and the project is expected to be completed in early 2028, subject to normal construction risks and schedule changes.

Key project features

Feature Details
Project name Hoboken Urby
Address 256 Observer Highway (Observer Highway & Park Avenue), Hoboken, N.J.
Loan amount $162,000,000 (senior construction loan)
Lender PCCP
Borrower Affiliate of Ironstate Holdings
Financing execution BlueGate Partners (execution team: Mark DeLillo, Marc Schulder, Lee Spiegelman, Felipe Marin, Eli Zaoutis, Jeremy Silber)
Size 418,332 sq ft; ~1.1-acre site; 16 stories
Units 345 total (307 market-rate, 38 affordable)
Unit mix 29 studios (8%), 220 one-bed (64%), 61 two-bed (18%), 35 three-bed (10%)
Retail ~17,000–17,425 sq ft (includes café)
Parking Reported 152 spaces
Amenities Café, speakeasy, concierge, landscaped deck with BBQ, fitness center, rooftop dog run, extensive common spaces
Transit Under 0.25 mile to PATH; a few blocks to Hoboken Terminal; PATH ~11 min to WTC, ~16 min to 33rd St
Expected completion Early 2028

Deeper Dive: News & Info About This Topic

Additional Resources

Construction TX News
Author: Construction TX News

TEXAS STAFF WRITER The TEXAS STAFF WRITER represents the experienced team at constructiontxnews.com, your go-to source for actionable local news and information in Texas and beyond. Specializing in "news you can use," we cover essential topics like product reviews for personal and business needs, local business directories, politics, real estate trends, neighborhood insights, and state news affecting the area—with deep expertise drawn from years of dedicated reporting and strong community input, including local press releases and business updates. We deliver top reporting on high-value events such as the Texas Construction Expo, major infrastructure unveilings, and advancements in construction technology showcases. Our coverage extends to key organizations like the Associated General Contractors of Texas and the Texas Building Branch, plus leading businesses in construction and real estate that power the local economy such as Austin Commercial and CMiC Global. As part of the broader network, including constructioncanews.com, constructionnynews.com, and constructionflnews.com, we provide comprehensive, credible insights into the dynamic construction landscape across multiple states.

Article Sponsored by:

CMiC Global

CMIC Global Logo

Since 1974, CMiC has been a global leader in enterprise software for the construction industry. Headquartered in Toronto, Canada, CMiC delivers a fully integrated platform that streamlines project management, financials, and field operations.

With a focus on innovation and customer success, CMiC empowers construction firms to enhance efficiency, improve collaboration, and make data-driven decisions. Trusted by industry leaders worldwide, CMiC continues to shape the future of construction technology.

Read More About CMiC: 

Stay Connected

More Updates

Would You Like To Add Your Business?

WordPress Ads